Group,
There was a recent article in the May 2018 issue of “Power Engineering” regarding the new facility in Rochester, MN. Art Killinger (a long-standing MPR engineer and colleague of mine, who a number of you know) brought it to my attention and I thought it was worth sharing. See attached link.
Based upon this article of RPU’s 47MW and the recent Collaboration Call with Mark Maurer, of Upper Michigan Energy Resource Corporation (UMERC), now installing 180MW, there seems to be a lot of activity in the Northern Mid-West (MN, MI, etc).
https://share.mpr.com/s/0A2r0kfq7wadvEq
To access, use temporary password: Password123!
rgds,
Rob